No SEC-indexed companies match “”.
↑↓ Navigate ↵ Open Esc Close0 companies
VLONYSEEnergy & Utilities

Valero Energy Corp.

Pricing in a slowdown to -4.1%/yr (vs. 1.9%/yr historically), with a high-signal 10-Q change in Capital Allocation.

VLO Filing Alerts

Get notified on new Valero Energy Corp. filings

Get a concise email whenever VLO files a new 10-K or 10-Q, covering True FCF changes, SBC shifts, and Risk Factor diffs. Zero spam.

PortfolioCompare
Share Price
$323.00
Close 2026-11-25
Market Cap
$90.1B
Enterprise Value
$91.2B
Priced-In GrowthModel →
-4.1%Hist 1.9%/yr
True FCF (TTM)5.8x EV
$15.8B10.3% margin
Share Chg (4Y)Stock Comp 0.1%
-6.7%285M shs
Filings & InsidersView →
5 Diffs2 High

Key Filing Takeaways

  • Capital Allocation: Share count shrank 6.7%/yr over 5 years
  • Executive Comp: Executive or Board Change (Item 5.02)
  • Risk Factors: New material risk disclosure disclosure in latest 10-Q (2026-10-28)
VLO Filing Alerts

Get notified on new Valero Energy Corp. filings

Get a concise email whenever VLO files a new 10-K or 10-Q, covering True FCF changes, SBC shifts, and Risk Factor diffs. Zero spam.

MedRisk Factors10-Q (2026-10-28)
Item 2: MD&A (10-Q Text Diff)

New material risk disclosure disclosure in latest 10-Q (2026-10-28)

Consecutive 10-Q comparison (2026-07-30 vs. 2026-10-28) detected newly added or materially revised Item 2: MD&A language referencing material risk disclosure.

Before

“Prior 10-Q (2026-07-30) did not contain equivalent disclosure language in Item 2: MD&A.”

After

“(c) Operating expenses (excluding depreciation and amortization expense) for the three and nine months ended September 30, 2025 includes employee retention and separation costs of $50 million related to the Benicia Refinery. In connection with our plan to ceas”

Amber Take: Extracted deterministically by comparing paragraph-level novelty across consecutive SEC EDGAR 10-Q filings.

EDGAR 0001628280-26-067679 ↗
WatchExecutive Comp10-Q (2026-10-28)
XBRL Cash Flow Statement: SBC Reconciliation

SBC consumed 0.7% of Reported FCF (0.1% of revenue)

In TTM, Valero Energy Corp. generated $15.96B in Reported FCF against $0.12B in Stock-Based Compensation, yielding $15.84B in True FCF (10.3% margin).

Before

“FY25 SEC filing: Reported FCF $5.83B | SBC $0.12B (0.1% of rev) | True FCF $5.71B.”

After

“TTM SEC 10-Q: Reported FCF $15.96B | SBC $0.12B (0.1% of rev) | True FCF $15.84B.”

Amber Take: Disciplined SBC load keeps True FCF closely aligned with reported cash flow.

EDGAR 0001628280-26-067679 ↗
HighCapital Allocation10-Q (2026-10-28)
XBRL Equity & Cash Flow: Dilution vs. Buybacks

Share count shrank 6.7%/yr over 5 years

Weighted-average diluted shares moved from 407M in FY21 to 285M in TTM, with $7.26B deployed into share repurchases in the latest fiscal year.

Before

“FY21 SEC filing: 407M diluted shares | CapEx $2.46B.”

After

“TTM 10-K: 285M diluted shares | CapEx $0.00B | Buybacks $7.26B.”

Amber Take: Net share retirement provides a durable per-share FCF compounding tailwind.

EDGAR 0001628280-26-067679 ↗
HighExecutive Comp8-K (2026-09-18)
Item 5.02

Executive or Board Change (Item 5.02)

Valero Energy Corp. filed SEC Form 8-K on 2026-09-18 disclosing Executive or Board Change (Item 5.02).

Before

“Prior periodic filing did not reflect this current-report event.”

After

“SEC Form 8-K filed 2026-09-18 under Item 5.02: Executive or Board Change. Inspect the full EDGAR filing for exact terms.”

Amber Take: Leadership turnover (CEO, CFO, or Board departures/appointments) often precedes strategic or guidance shifts.

EDGAR 0001628280-26-062625 ↗
MedRisk Factors10-K (2026-02-25)
Item 1A: Risk Factors

Low-carbon and pipeline projects face permitting and cancellation risks

Valero added disclosure noting that opposition to both fossil fuel infrastructure and low-carbon projects, including carbon capture and sequestration, is making project approvals more difficult and costly. Such opposition has previously caused project cancellations or restructurings.

Before

“No equivalent disclosure language appeared in the prior 10-K.”

After

“challenges to or opposition of certain fossil fuel and infrastructure projects (including pipelines), as well as certain low-carbon projects (such as carbon sequestration and carbon capture and storage), continue to make the approval and completion of such projects more difficult and costly.”

Amber Take: Watch for potential capex delays or write-offs in Valero's low-carbon and pipeline development pipeline.

EDGAR 0001628280-26-011499 ↗